🚚 Free Worldwide Shipping on All Orders!Shop Now
Product image 1
HomeStore

Hem and Boo Non Slip Double Handle Long Lead

Hem and Boo Non Slip Double Handle Long Lead

* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo double handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.

Size: 180cm x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Double Handle for Extra Control
  • Padded Neoprene Handle
$15.17
Hem and Boo Non Slip Double Handle Long Lead
$15.17

Product Information

Shipping & Returns

Description

* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo double handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.

Size: 180cm x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Double Handle for Extra Control
  • Padded Neoprene Handle