🚚 Free Worldwide Shipping on All Orders!Shop Now
Product image 1
Product image 2
Product image 3
Product image 4
HomeStore

Hem and Boo Sports Training Long Lead Orange (3 sizes)

Hem and Boo Sports Training Long Lead Orange (3 sizes)

The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.

Available in 3 Sizes: 5m x 2.5cm/ 10m x 2.5cm/ 15m x 2.5cm.

Details

  • Reflective for Safety
  • Bright so Easily Visible
  • Perfect Recall and Distance Control
  • Padded Neoprene Handle
Select Size
From $6.37

Original: $18.21

-65%
Hem and Boo Sports Training Long Lead Orange (3 sizes)—

$18.21

$6.37

Product Information

Shipping & Returns

Description

The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.

Available in 3 Sizes: 5m x 2.5cm/ 10m x 2.5cm/ 15m x 2.5cm.

Details

  • Reflective for Safety
  • Bright so Easily Visible
  • Perfect Recall and Distance Control
  • Padded Neoprene Handle
Hem and Boo Sports Training Long Lead Orange (3 sizes) | Pet Health Club Shop